Skip to content
GUIDEDeep dive

Retrofit: Can the Floor Host Tubing

Retrofit success is about the floor, not the boiler: where the tubing goes, how much height you lose, where insulation sits.

Updated 2026-11-19 · Formula checked

Three approaches

Dry plates: about 15–20 mm added height, good on wood floors.

Thin pour: about 30–40 mm, load must be checked.

Full rebuild: most expensive, best thermal result.

Three checks

Doors and transitions: height gain means trimming doors and adjusting stairs.

Insulation below: wood floors need insulation or heat goes down.

Waterproofing in wet rooms before tubing.

Sources

Water Temperature Decides EverythingRead guide

Check your use case first

Five things to check before ordering

How to compare specs

When not to buy

Budget and alternatives

Common mistakes

How we check these numbers

This guide does three things: it breaks costs and conditions into checkable line items, it marks which figures come from official sources, and it flags what varies by city, year or personal situation. We do not treat a single quote as a universal conclusion, and we do not cite percentages we cannot trace.

If you remember one thing: use the checklist here to question quotes, not a single total to compare them.

KEEP READING

Keep reading

Read in order, or jump to another guide on the same topic.

All guides →

None

Top picks

Radiant Installer

Install

Check price
Electric Mat

Electric mat

Check price
Boiler

Heat source

Check price

Affiliate disclosure: this page links to commercial partners; we currently pass no tracking parameters, so we earn no commission from them.

Sources